Basics of IT project management

Project Management
An idea moves to implementation through various phases of project viz. initiation, plan, execution, observation, control and closure. And the major three constraints of Project Management aka Triple Constraints are time, scope and cost.
A successful project should maintain equilibrium of the three.  The project is considered as a disaster if one of these goes out of frame.

IT Project Management is considered as an effort to manage number of short term operations, such as creation of new product, server chaning, customization etc with good coordination.

Comments »

The URI to TrackBack this entry is: http://projectmanagement.blogsome.com/2008/01/31/basics-of-it-project-management/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>



Anti-spam measure: please retype the above text into the box provided.